Santiago Bernabéu Stadium

Madrid
建筑师
L35
位置
Concha Espina 1, 28036 Madrid
年份
2023

Although the new envelope is shaped freely, its geometry is not accidental. The curved volumes are able to reflect light in a changing way, its marked lines expressing energy and drive.

While visually dominating its surroundings, the stadium volume is adapted to the program behind it, swelling or shrinking without losing unity or character.

The ventilated cladding material is designed to allow or to block sunlight through its changing pattern. The skin geometry is line-based, which allows a building process that -despite its high-tech component- is relatively simple and allows for large sections to be shop-assembled.

From the structural point of view, the new roof is designed with elegance and efficiency. A compression beam rests neatly on the existing concrete columns. Supported on this outer ring, the inner ring is supported on stressed cables. The whole roof is mounted on the pitch and lifted into position.

In collaboration with Ribas&Ribas/GMP Architekten

相关项目

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

杂志

以下出品方的其他项目 L35

Eurobuilding Hotel
Madrid
Puerto Venecia
Zaragoza
La Maquinista
Barcelona
Jacksonville Southbank Riverwalk
Miami, 美國
Antequera Train Station
Malaga