Hospital del Mar Bg. I Phase III

Barcelona
照片 © Juny Brullet
照片 © Juny Brullet
照片 © Juny Brullet
照片 © Juny Brullet
照片 © Juny Brullet
照片 © Marcela Grassi
照片 © Marcela Grassi
照片 © Marcela Grassi
建筑师
PINEARQ
地址
Pg. Marítim de la Barceloneta, 25-29, 08003 Barcelona
年份
2017
团队
Alberto de Pineda, Manuel Brullet, Raúl Garcia, Alfonso de Luna, Simona Iaquinto, Jose Olagüe

The new hospital building completes the west façade of the health macro-block of Hospital del Mar and opens towards the Barceloneta park. The first phase of the extension project for hospital services incorporates the criteria adopted since the renovation in 1992 and becomes the starting point in the transformation of the spaces for the future. In consequence, criteria of energy efficiency are adopted and infrastructures of the latest technology are used.

The topographical relation with the immediate surroundings of the block and with the external structures is fundamental. The materials of façade and internal finishes follow the line of the buildings of the block: exposed concrete, glass and wood, lacquered steel and die-cut aluminium sheet, coloured resin panels.

相关项目

  • 6280.CH Coworking Hub
    Evolution Design
  • Hohes Holz auf der Lichtung | Neubau Büro- und Verwaltungsgebäude für die Ziegler Group
    Brückner & Brückner Architekten
  • 海口美舍河生态修复工程
    土人设计
  • 重庆市潼南大佛寺湿地公园
    土人设计
  • 六盘水明湖湿地公园
    土人设计

杂志

以下出品方的其他项目 PINEARQ

Hospital Beatriz Angelo
Loures, Portugal
Marina Salud Hospital in Dénia
Dénia
Renovation and Extension of Granollers Asylum Hospital
Granollers
Doctor Moisès Broggi Hospital
Sant Joan Despí
Barcelona Biomedical Research Park
Barcelona
QuirónSalud Madrid University Hospital
Pozuelo de Alarcón