Hospital del Mar Bg. I Phase III

Barcelona
写真 © Juny Brullet
写真 © Juny Brullet
写真 © Juny Brullet
写真 © Juny Brullet
写真 © Juny Brullet
写真 © Marcela Grassi
写真 © Marcela Grassi
写真 © Marcela Grassi
建築家
PINEARQ
住所
Pg. Marítim de la Barceloneta, 25-29, 08003 Barcelona
2017
チーム
Alberto de Pineda, Manuel Brullet, Raúl Garcia, Alfonso de Luna, Simona Iaquinto, Jose Olagüe

The new hospital building completes the west façade of the health macro-block of Hospital del Mar and opens towards the Barceloneta park. The first phase of the extension project for hospital services incorporates the criteria adopted since the renovation in 1992 and becomes the starting point in the transformation of the spaces for the future. In consequence, criteria of energy efficiency are adopted and infrastructures of the latest technology are used.

The topographical relation with the immediate surroundings of the block and with the external structures is fundamental. The materials of façade and internal finishes follow the line of the buildings of the block: exposed concrete, glass and wood, lacquered steel and die-cut aluminium sheet, coloured resin panels.

関連したプロジェクト

  • Kanzlei in der Brauerei
    Martin Schmitt Architektur
  • Kantine der Ecole Voltaire
    Martin Schmitt Architektur
  • HQ CORDEEL
    Binst Architects
  • Foshan Poly • OPUS ONE
    CCD (Cheng Chung Design)
  • Lattenburg
    he und du ZT KG

Magazine

PINEARQ によるその他のプロジェクト

Hospital Beatriz Angelo
Loures, Portugal
Marina Salud Hospital in Dénia
Dénia
Renovation and Extension of Granollers Asylum Hospital
Granollers
Doctor Moisès Broggi Hospital
Sant Joan Despí
Barcelona Biomedical Research Park
Barcelona
QuirónSalud Madrid University Hospital
Pozuelo de Alarcón